Dammed if you do, dammed if you don't. What would you prefer?
A) TH, once granted, get the 2nd stage to the port and deployed. Lift TH.
B) No TH, potential for Shareholders to see the 2nd stage being moved in, loading up before Price Sensitive ann.
Nothing wrong with Management playing it safe. Good progress at the end of the day, long may in continue.
- Forums
- ASX - By Stock
- Ann: Bunbury Demonstration Wave Energy Farm Update-POW.AX
Dammed if you do, dammed if you don't. What would you prefer? A)...
-
-
- There are more pages in this discussion • 40 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add POW (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.8¢ |
Change
0.000(0.00%) |
Mkt cap ! $5.204M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
POW (ASX) Chart |
Day chart unavailable