re: Ann: GGP: Bullseye Prospect Operational U...
The announcement indicates that there has been signs of oil and gas in the mudlogs as expected at the Camerina level.
That info probably / possibly links in with the comments in last weeks SONRIS report which commented about loss of drilling mud and a fluid flow.
Miogyp is next once they start drilling ahead again from their present 12,339 feet.
That could mean that it will well into the first week in April before they get down to that 14,200 feet level that they are aiming for (the Cib Haz layer).
Don't mind watching this paint dry if we get a good finish !
QPN Price at posting:
0.8¢ Sentiment: Hold Disclosure: Held