GGE 0.00% 0.3¢ grand gulf energy limited

Ann: Boleslaw 1 Well Final Drilling Report, page-2

ANNOUNCEMENT SPONSORED BY PLUS500
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM
CFD Service. Your Capital is at risk
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
  1. 15,831 Posts.
    lightbulb Created with Sketch. 216
    Highlights  The Well spudded on 10 December 2016 and reached a total depth (‘TD’) of 1550 metres on 10th January 2017.  The well intersected the designated objectives, however no commercial recoverable hydrocarbons were indicated.  The well will be plugged and abandoned shortly following petrophysical analysis.  Partners in the Kolo licence will conduct a detailed post-drill technical review of all relevant well and seismic data to determine the way forward with this large exploration licence.  The Kolo block has additional independent prospectivity including an oil target that has been identified based on the re-interpretation of seismic data using sequence stratigraphy techniques.  The oil target is a turbidite system fan, typical of a possible low-stand systems tract.  Boleslaw #1 was drilled safely, on schedule, and on budget.  GGE has a 20.4% interest in the Kolo Licence which covers 1,150 square kilometres.  Other Partners include Prospex Oil & Gas Plc (PXOG.L:AIM)
 
watchlist Created with Sketch. Add GGE (ASX) to my watchlist
(20min delay)
Last
0.3¢
Change
0.000(0.00%)
Mkt cap ! $9.380M
Open High Low Value Volume
0.3¢ 0.3¢ 0.3¢ $3K 1M

Buyers (Bids)

No. Vol. Price($)
23 19418675 0.2¢
 

Sellers (Offers)

Price($) Vol. No.
0.3¢ 175000 1
View Market Depth
Last trade - 12.25pm 22/11/2024 (20 minute delay) ?
GGE (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.