We have to get a Contractor locked in and ready to work at the first oppprtunity. Hopefully a fly over in May/June. Drilling by September/October, with results by December.
AN1 CuFe sells its Crossroads gold royalty to Northern Star for $4M cash; says better than waiting for mine launch
Week 46 Wrap: Copper hits 2mth low as Trump threatens net zero pace; US rally fades; HotCopper’s picks