ORE 5.11% $6.13 orocobre limited

Ann: Becoming a substantial holder, page-12

ANNOUNCEMENT SPONSORED BY PLUS500
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM
CFD Service. Your Capital is at risk
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
  1. 1,993 Posts.
    lightbulb Created with Sketch. 166
    Both. The plant (Stage 1) is designed to produce up to 100% battery grade, but there are customers that only require industrial grade, primarily those with plants to convert Lithium Carbonate to Lithium Hydroxide.

    Note that while industrial grade sells for a lower price, it also costs less to make - The Olaroz plant has a primary circuit that produces industrial grade, and a separate purification circuit that converts industrial grade to battery grade, so industrial grade product doesn't have the cost of processing through the purification circuit.

    The Olaroz Stage 2 expansion only includes a primary circuit, and therefore only produces industrial grade. This is by design since the majority of Stage 2 output is intended for the joint (with Toyota) carbonate to hydroxide conversion plant being built in Japan.

    I agree that a price near $3 is a bargain, and I would certainly consider topping up if I had any spare cash.
 
watchlist Created with Sketch. Add ORE (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.