Nah mate some juicy stuff in this although-
1. Plant approvals -▪ All of the requisite permits, approvals and licenses for the Joint Venture to operate the Luapula Processing Facility will be in place ahead of the re-listing on the ASX
2.Plant optimisation - Study work completed in 2018/19 to upgrade plant to produce a cobalt hydroxide concentrate with additional copper hydroxide concentrate production
Detailed design and process flow sheet optimisation completed
3. Plant valuation - Winmar expects to release an ASX announcement on independent valuation by no later than 15 March 2019
4. MORE FEED (this is Hughe!!)Further advanced high grade cobalt projects also identified and under negotiation to provide additional feed to the processing facility
5. ASX re-listing process well advanced and process for dual listing on LSE being run in parallel ( read page 22 and all items for ASX relisting satified other than discussions on offtake in train
WFE Price at posting:
2.4¢ Sentiment: Buy Disclosure: Held