NZ'd as far as how much we pay for Bara depends on whether or not or by how much the drill exceeded the $25million which we were free carried on. Still no nod from the DOE on the other 10% so we are still only liable for 10% if there was an overun. WL is a big decision and with capex of $250 mil we are looking at $50 mil and no doubt this will blow out and there is still a high degree of risk. No guarantee it will go as smoothly as Galoc phase 2. And if it did go ahead it would be now 18mnths to 2 years away I'd reckon. SC58 is a dead duck IMO and they have a year before another commitment well is due at 63. Something is needed in the short term now and apart from some producing asset purchase can't see much. I do wonder what life, time wise those Talisman lease have left in them. Revisit 54A maybe.? All IMO only
- Forums
- ASX - By Stock
- Ann: Baragatan-1A Update
NZ'd as far as how much we pay for Bara depends on whether or...
-
- There are more pages in this discussion • 12 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add NDO (ASX) to my watchlist