Now DST is drill stem test to determine permiability(porosity) and pressure?
Whats the likely time frame for a DST to get conclusive results back about the quality of the reservoir? Couple weeks or days?
I might be getting ahead of myself but it does seem to be taking a very long time to get through the lower section.
If the rig had issue we would have heard surely, it seems like its very slow going, based on planned time frame and what I have heard from the experts on this site and most probably due to pressure issues?
Its a guessing game from this distance, without any updates, but my gut tells me there is something down there.
Hopefully black or dark brown in color.
- Forums
- ASX - By Stock
- NDO
- Ann: Baragatan-1A Update
Ann: Baragatan-1A Update, page-85
-
-
- There are more pages in this discussion • 44 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add NDO (ASX) to my watchlist