"Nido Petroleum Limited (ASX: NDO) (“Nido” or the “Company”) on behalf of SC 63 Joint Venture
partners PNOC-EC and Dragon Oil (SC 63 Philippines) Limited wishes to advise that the Baragatan-
1A well as at 2 July 2014 was currently at 2,457 meters Measured Depth (2,152.9 meters TVD sub-sea)
Since the last update on 23 June 2014, continuing formation pressure and unstable well bore
conditions in the 8 ½” hole section required the setting of the 7” liner at 2,356 meters Measured
Depth (2,109 meters TVD sub-sea). Following the successful setting of the 7” liner, stable hole
conditions were established although drilling performance has been reduced in the 6” hole section.
Current operation was changing the drill-bit before drilling ahead in 6” hole towards the primary
reservoir objective"
- Forums
- ASX - By Stock
- Ann: Baragatan-1A Update
"Nido Petroleum Limited (ASX: NDO) (“Nido” or the “Company”) on...
-
-
- There are more pages in this discussion • 15 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add NDO (ASX) to my watchlist