Calibration should have been completed long before any commercial production product was sent to ANY customer for qualification as any changes in the production circuit will alter the final product mesh size fraction percentages or metallurgically.
This shows the lack of graphite production experience with continuous issues with the production circuit either mechanically or through a flaw in the flow sheet / design.
- Forums
- ASX - By Stock
- Ann: Balama Production Update
Calibration should have been completed long before any...
-
- There are more pages in this discussion • 9 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add SYR (ASX) to my watchlist
(20min delay)
|
|||||
Last
21.5¢ |
Change
-0.005(2.27%) |
Mkt cap ! $232.8M |
Open | High | Low | Value | Volume |
22.0¢ | 22.0¢ | 21.5¢ | $133.3K | 617.3K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
23 | 1036310 | 21.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
22.0¢ | 157618 | 15 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
8 | 116062 | 1.070 |
10 | 209299 | 1.065 |
8 | 106613 | 1.060 |
6 | 96647 | 1.055 |
10 | 132219 | 1.050 |
Price($) | Vol. | No. |
---|---|---|
1.075 | 58078 | 4 |
1.080 | 70753 | 4 |
1.085 | 72117 | 5 |
1.090 | 103210 | 6 |
1.095 | 57928 | 2 |
Last trade - 13.19pm 29/11/2024 (20 minute delay) ? |
SYR (ASX) Chart |