From the latest presentation Teck has spent US $2.06 m in 2017 and will send another US$ 2 m in 2018. Geologist and Geopolitical surveys start in February and stage 2 driling will start in August. I’m so happy Tech is doing stage 2 driling. So stage 1 and stage 2 driling cost Tech US $4.06 m.