re: Ann: ITR: Australia Update - PEP 167 Proj... ""29 November...

ANNOUNCEMENT SPONSORED BY PLUS500
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM
CFD Service. Your Capital is at risk
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
  1. 6,352 Posts.
    lightbulb Created with Sketch. 62
    re: Ann: ITR: Australia Update - PEP 167 Proj... ""29 November 2010
    AUSTRALIA UPDATE:
    PEP 167 PROJECT STATUS
    Interra Resources Limited (the Company or Interra) wishes to inform shareholders that the PEP 167 joint venture plans to drill a new well to follow up on the 1987
    Windermere-1 oil discovery in the onshore Otway Basin, near Portland, in Western Victoria. PEP 167 is jointly held by Interras wholly owned subsidiary, Interra Resources (Australia) Pte. Ltd. (50%) and Bass Strait Oil Company Ltd (BAS) (50% and operator).
    The 1987 Windermere-1 well produced oil on test but was not developed for production given the low oil prices and the available technology at that time. The joint ventures April 2010 3D seismic survey has provided a high resolution image of the subsurface structure and confirms closure at the Windermere oil reservoir level.
    Planning has commenced targeting a drilling project in the second quarter of 2011, subject to approval by relevant local government agencies.
    Given the recovery of oil from the 1987 well and the new 3D seismic interpretation, many of the risks usually associated with exploration drilling are significantly reduced at the Windermere project. A series of technical studies has also been conducted focused at applying careful well design and modern drilling and completion
    techniques and thereby enhancing the chance of a successful project. Success at the Windermere closure would likely lead to development wells on the Windermere
    structure as well as possible appraisal drilling of other newly mapped structures.
    Windermere is located on easy terrain and with good all-weather road access. PEP167 also benefits from local infrastructure and support and a relatively short transport
    distance via sealed highway to the Geelong refinery. Therefore, if oil production is established at Windermere, a relatively short development schedule is anticipated.""

    All sounds good to me
 
watchlist Created with Sketch. Add BAS (ASX) to my watchlist
(20min delay)
Last
6.5¢
Change
-0.006(8.45%)
Mkt cap ! $26.13M
Open High Low Value Volume
6.9¢ 6.9¢ 6.5¢ $18.97K 286.9K

Buyers (Bids)

No. Vol. Price($)
2 31250 6.4¢
 

Sellers (Offers)

Price($) Vol. No.
6.9¢ 1047 1
View Market Depth
Last trade - 15.53pm 07/11/2024 (20 minute delay) ?
BAS (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.