Eagle Bay Resources advises that due to the drill stem test tools becomingVanessa-1 has been plugged back to 2783 and a sidetrack (Vanessa-1 ST-1) is currently being drilled. It is expected that Vanessa-1 ST-1 will reach total depth by the weekend.
Current operations is drilling 8 ½” sidetrack.
Some very persistent activity occurring here.
- Forums
- ASX - By Stock
- EBR
- ann at last
ann at last
Featured News
Add EBR (ASX) to my watchlist