The size of that block ATP 2041 is impressive and if Santos-Shell are getting excited about their little dirt patch we ought to as well with all of the blocks we have in the area and I think Armour will keep applying for more which only makes it more logical for us to be granted more in the area given our growing land holdings and available infrastructure.
Well done Armour, will be happy to see our production re-rated to 15Tj/d very soon too, some really nice feel good Xmas gifts