Nice little tail end to that announcement.
Armour has successfully drilled the Myall Creek 4A well, which is currently shut‐in on build‐up in
preparation for the installation of the 2‐3/8’’ production tubing. Armour is awaiting the release of the
workover rig from another operator, and once the tubing is installed, it is antipated that the well will be
on‐line and in production later this month. The results of Myall Creek 4A well are still being received, and
evaluation of the data is being progressed and will assist in the design of future drilling and completions
operations in this field.
Armour is also enjoying significant liquids production of light oil or condensate and LPG in the restarted
wells on the Kincora Project, and this is an important contributor to growing positive cash flows.