Production from the pilot plant will tell us a lot about grades and it will go a long way to financing operations as well.
I've said before that I reckon early production from the dolerite should go ~10oz/t Au because they'll commence mining on the highest grade ground.
Mineralisation is disseminated and it certainly looks like it's widespread so although there will be some grade variability the grade might not drop off too much as production increases. We need diamond drilling results to get a proper feel for the spatial grade variability.
BBX Price at posting:
25.0¢ Sentiment: Buy Disclosure: Held