He/I was talking about the production optimisation on the fields that they gained from Pertamina. Tangai-1 well, he refers to the install of a pump that was going to occur but identified that the main issue was calcification in the pipe. So basically "free" and quick optimisation. From 50 to 300 barrels a day. Bunian-3 well was in relation to opening up the potential by twin lines and removing the bottle necks. A few pumps to be repaired as well. With the drilling program and 3D seismic information showing substantial reserves they're in a prime position to grow immensely. Let's hope crude remains stable. Info from good oil conference late last year.
- Forums
- ASX - By Stock
- Ann: Appendix 3B
He/I was talking about the production optimisation on the fields...
-
- There are more pages in this discussion • 27 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add BAS (ASX) to my watchlist
(20min delay)
|
|||||
Last
6.5¢ |
Change
-0.006(8.45%) |
Mkt cap ! $26.13M |
Open | High | Low | Value | Volume |
6.9¢ | 6.9¢ | 6.5¢ | $18.97K | 286.9K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 31250 | 6.4¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
6.9¢ | 1047 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
29 | 40409156 | 0.002 |
15 | 11398553 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.003 | 2915000 | 2 |
0.004 | 34531772 | 28 |
0.005 | 6804239 | 9 |
0.006 | 6490111 | 9 |
0.007 | 5650225 | 6 |
Last trade - 15.53pm 07/11/2024 (20 minute delay) ? |
BAS (ASX) Chart |