Shady, After the release of the latest update Im very interest and looking forward to the release of the next intended drilling programme , imo there is enough info out there and with a DHEM for the engineers to zero in on the possible conductor even though it is 500 + mts down.
If I was involved in this programme I would be taking directional readings every 50 mts and correcting the intended direction with wedges so that the heart of the conductor is pierced.
First things first what is the programme and will it be finalised before the Xmas break ?
- Forums
- ASX - By Stock
- AUR
- Ann: Appendix 3B
Ann: Appendix 3B, page-5
-
- There are more pages in this discussion • 7 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add AUR (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.7¢ |
Change
0.000(0.00%) |
Mkt cap ! $2.383M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 1337500 | 0.6¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.8¢ | 493286 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 103729 | 0.030 |
1 | 218636 | 0.028 |
1 | 300000 | 0.024 |
2 | 200000 | 0.022 |
1 | 100000 | 0.020 |
Price($) | Vol. | No. |
---|---|---|
0.031 | 20000 | 1 |
0.034 | 194955 | 1 |
0.035 | 665000 | 1 |
0.036 | 58747 | 1 |
0.039 | 82835 | 1 |
Last trade - 16.12pm 22/11/2024 (20 minute delay) ? |
AUR (ASX) Chart |