As I understand, there were 2 rigs on Rupice North and 1 rig fence-lining JB Zone.
Hole 7 was an infill hole whereas Hole 8 was drilling up and down dip along strike.
Two takeaways:
1. One rig is focused on stepping out along strike
2. Second rig is focused on infilling resource
Therefore:
1. Hole 9 and 10 were drilled simultaneously
2. Hole 9 is likely infill and thus not material
3. Hole 10 is likely the vertical hole drilled off the same pad as Hole 8 and is material because it extends strike down plunge.
- Forums
- ASX - By Stock
- ADT
- Ann: Annual Report to shareholders
Ann: Annual Report to shareholders, page-19
-
-
- There are more pages in this discussion • 2 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add ADT (ASX) to my watchlist
(20min delay)
|
|||||
Last
$4.17 |
Change
0.040(0.97%) |
Mkt cap ! $918.1M |
Open | High | Low | Value | Volume |
$4.15 | $4.20 | $4.14 | $900.3K | 215.3K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 5000 | $4.07 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$4.20 | 61737 | 7 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 1197 | 0.835 |
1 | 5000 | 0.815 |
3 | 9950 | 0.810 |
2 | 21000 | 0.805 |
6 | 46713 | 0.800 |
Price($) | Vol. | No. |
---|---|---|
0.840 | 40000 | 1 |
0.850 | 14746 | 1 |
0.860 | 9795 | 2 |
0.875 | 9168 | 2 |
0.880 | 17293 | 2 |
Last trade - 16.10pm 29/11/2024 (20 minute delay) ? |
ADT (ASX) Chart |