I don’t like this slip up much as it leaves a few questions unanswered.
What is the hole number of the vertical hole from the same hole collar as hole 8?
If this hole missed the ore body there could be a fault offset which is not desirable as you’d need to pick up on the ore body again or it might just be faulted away or terminated, never to be located again
Where is hole 9? Is hole 9 the hole I’m referring to above?
Hole 10 looks great but if it’s just an up or down dip hole it’s not as significant as a strike extension hole or a duster on a strike extension hole.
This is sloppy and unprofessional and needs fixing quickly IMO. Hole results with no location information!!!!
Eshmun
- Forums
- ASX - By Stock
- ADT
- Ann: Annual Report to shareholders
Ann: Annual Report to shareholders, page-18
-
- There are more pages in this discussion • 3 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add ADT (ASX) to my watchlist
(20min delay)
|
|||||
Last
$4.17 |
Change
0.040(0.97%) |
Mkt cap ! $918.1M |
Open | High | Low | Value | Volume |
$4.15 | $4.20 | $4.14 | $900.3K | 215.3K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 5000 | $4.07 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$4.20 | 61737 | 7 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 1197 | 0.835 |
1 | 5000 | 0.815 |
3 | 9950 | 0.810 |
2 | 21000 | 0.805 |
6 | 46713 | 0.800 |
Price($) | Vol. | No. |
---|---|---|
0.840 | 40000 | 1 |
0.850 | 14746 | 1 |
0.860 | 9795 | 2 |
0.875 | 9168 | 2 |
0.880 | 17293 | 2 |
Last trade - 16.10pm 29/11/2024 (20 minute delay) ? |
ADT (ASX) Chart |