I’m not an expert and don’t have time to go refresh on details at moment. But, TON is starting off with the benefits of local experience and learning from mistakes made by SYR. I think the same engineers are designing mine (from memory) as use for SYR, or something like that. And group doing the construction contrart has lots of recent experience & would think they could give us a good ball park figure on completion dates, etc.
I believe many of the problems faced by SYR were due to them rushing into it with not enough preparation. TON (and many other good projects) has done great due diligence and feedback with potential customers. It is basically a good “shovel ready” project that has a good chance of going forward.
But, yes delays could happen in construction. However, You would think the construction group is keep (& professional enough) to get the job done right and fast so that they can move onto the next job. Time is also money to them. Anyway sounds good to me.
- Forums
- ASX - By Stock
- Ann: Ancuabe Permitting Update
I’m not an expert and don’t have time to go refresh on details...
-
- There are more pages in this discussion • 20 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add TON (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.9¢ |
Change
0.000(0.00%) |
Mkt cap ! $21.95M |
Open | High | Low | Value | Volume |
0.9¢ | 0.9¢ | 0.9¢ | $834 | 92.70K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
12 | 4125116 | 0.8¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.9¢ | 154589 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 550000 | 0.008 |
4 | 534764 | 0.007 |
7 | 3575306 | 0.006 |
6 | 4939995 | 0.005 |
3 | 1125250 | 0.004 |
Price($) | Vol. | No. |
---|---|---|
0.009 | 384712 | 2 |
0.010 | 1834280 | 10 |
0.011 | 90905 | 2 |
0.012 | 1217293 | 4 |
0.014 | 400000 | 1 |
Last trade - 11.49am 19/11/2024 (20 minute delay) ? |
TON (ASX) Chart |