no bfs for the smaller plant. such a small plant would not warrant a bfs that AKA are going straight to BFS (rather than to PFS) shows the feasibility needs should be relatively small as i posted, my guess is say $5M to $7M for the BFS
History-making uranium sample grades and an imminent drill run. Infini Resources is poised to transform in 2025
ACW This biotech stock raised $11M in a risk-off environment. Its Alzheimer's drug could change the game