AKA 0.00% 8.8¢ australia minerals and mining group ltd

I have only a little more stock left in AKA and may hold that as...

ANNOUNCEMENT SPONSORED BY PLUS500
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM
CFD Service. Your Capital is at risk
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
  1. 23,765 Posts.
    lightbulb Created with Sketch. 258
    I have only a little more stock left in AKA and may hold that as would need some when/if there is a rights issue and if the company goes back to deciding on a smaller plant again.
    As for the 700tpa tonker toy , it was going to generate around $20M in cash flow per annum for around a $10M in CAPEX (from memory) to me I was very happy with that payback -why be greedy

    If there was a problem with a component as is possible as there was no preceeding plant of this design for Kaolin then it is not a big deal retrofitting a pilot plant from an engineering perspective and also probably not an onerous financial cost compared with a plant over 4 times the size.
    The combination of increasing cash in treasury and an increased repository of knowledge occurring from a pilot plant that is put in place over a year ahead of a larger plant to me outweighs going for a larger plants production that to me could well mean the company has to go back to entice share holders for shares at a lower share price than the market price for funding .
    Also it would be far easier getting an offtake agreement with a smaller tonnage being sold and with a higher price for that product sale.
    Be interesting to see what happens here however it does not currently fit the business model I am interested in.
 
watchlist Created with Sketch. Add AKA (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.