Can someone clarify the below for me:
a. I thought aircore drilling was ok till around 300m. But this ann states 700m - 1300m?
b. My maths is challenged by how the below statement adds up. At max it adds to 5200m
"Approximately 7,000m of aircore is planned on four 700m to 1300m long drill lines spaced 2km to 4km apart"
- Forums
- ASX - By Stock
- ALY
- Ann: Alchemy Commences Drilling at Karonie Gold Project
Ann: Alchemy Commences Drilling at Karonie Gold Project, page-7
-
- There are more pages in this discussion • 19 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ALY (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.7¢ |
Change
0.000(0.00%) |
Mkt cap ! $7.068M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
12 | 10459854 | 0.6¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.7¢ | 766366 | 5 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 204000 | 0.013 |
6 | 1534407 | 0.012 |
3 | 1018000 | 0.011 |
4 | 1300000 | 0.010 |
1 | 100000 | 0.008 |
Price($) | Vol. | No. |
---|---|---|
0.014 | 431766 | 2 |
0.015 | 328000 | 2 |
0.016 | 492086 | 4 |
0.017 | 401126 | 3 |
0.019 | 196092 | 2 |
Last trade - 16.12pm 22/11/2024 (20 minute delay) ? |
Featured News
ALY (ASX) Chart |
Day chart unavailable