The new drill program at Napelapera is minimal, 1985 metres is less than 10 days drilling with one RC rig, not ground breaking and probably reflects not spending too much more on this prospect. Probably testing a concept more than anything.
Wadaradoo South looks interesting, would add tonnes to the mill. Wadaradoo East is completely a different beast, not mill feed at those grades. Heap leach potential yes, if significant tonnes are found, greater than 100 mtonnes and a very low strip ratio could make a separate project.
- Forums
- ASX - By Stock
- Ann: Africa Down Under Investor Presentation
The new drill program at Napelapera is minimal, 1985 metres is...
-
- There are more pages in this discussion • 8 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)