re: Ann: Advent Energy - Rig and Production T... I've been having a bit of a look at who we might actually sell gas to in the area if flows come up trumps
I guess the first potentual customer would be Verve as I assume they are going to need more power for the new area that are opening up.
KBL are about to put the Sorby Hills polymetalic mine into production so no doubt they will need a heap of power.
Argyle Diamonds appear to be expanding underground operations as well so should need more power.
In any event if we can get a decent flow goig we should be able to sell it.
Which should fund some further development and maybe get the shale proved up.
How cool would it be if we pulled off our own $100mil shale JV
- Forums
- ASX - By Stock
- Ann: Advent Energy - Rig and Production Testing E
-
- There are more pages in this discussion • 8 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add BPH (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.3¢ |
Change
0.001(8.33%) |
Mkt cap ! $14.46M |
Open | High | Low | Value | Volume |
1.2¢ | 1.3¢ | 1.2¢ | $616 | 48.08K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
29 | 7433777 | 1.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.3¢ | 924906 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
0 | 0 | 0.000 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.001 | 62969482 | 16 |
0.002 | 70002682 | 40 |
0.003 | 8922247 | 8 |
0.004 | 2999990 | 3 |
0.005 | 1500000 | 2 |
Last trade - 16.10pm 26/11/2024 (20 minute delay) ? |
BPH (ASX) Chart |