Does anyone know the distance that the concession was extended to the North at Rupice-Jurasavec Brestic
( down plunge ) and to the NE ( down dip )?
If anyone knows that maybe you also can tell me the distance extended to the SE where the mineralisation dips again from surface? Or do we have to wait for the Public review and subsequent approvals?
At this stage the more important is the N & NE ( obviously ) as that is where the drilling is underway and any down dip and down plunge extensions will have high multiple effects on this deposit.
I also think this is where confusion is for some as they may not see the difference on the xx yy cross sections, ( down dip and down plunge ).
Where yy is more than 3 times xx, any extension to down dip could have more than 3 times the down plunge extension and will soon be confirmed with the next few drill results.
Thanks, Wack.
- Forums
- ASX - By Stock
- Ann: Adriatic Metals Expands Concession Area at Vares Project
Does anyone know the distance that the concession was extended...
-
- There are more pages in this discussion • 3 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add ADT (ASX) to my watchlist
(20min delay)
|
|||||
Last
$4.17 |
Change
0.040(0.97%) |
Mkt cap ! $918.1M |
Open | High | Low | Value | Volume |
$4.15 | $4.20 | $4.14 | $900.3K | 215.3K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 5000 | $4.07 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$4.20 | 61737 | 7 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 1197 | 0.835 |
1 | 5000 | 0.815 |
3 | 9950 | 0.810 |
2 | 21000 | 0.805 |
6 | 46713 | 0.800 |
Price($) | Vol. | No. |
---|---|---|
0.840 | 40000 | 1 |
0.850 | 14746 | 1 |
0.860 | 9795 | 2 |
0.875 | 9168 | 2 |
0.880 | 17293 | 2 |
Last trade - 16.10pm 29/11/2024 (20 minute delay) ? |
ADT (ASX) Chart |