Bird #13-18 Well Successfully Reaches Target Depth • Oil shows were continual throughout Bottom 1,000 ft. of Pierre formation • Drill string being tripped out the well-bore and preparations to run a slotted production liner are underway • Flow testing to commence shortly with results due within two weeks • Drilling completed safely and on budget