Alvares 1 back on track for re-entry and testing program in early North American summer.
the highlight for SGC was a long delayed summer drill instead of spring test as earlier promised.. and testing in 2018 as promised before that....
so a cash call by the operator on all partners in october 2018 for a start of operations 9 months later..
given its now 5 months away, and real close to the rain periods in autumn, i am sure the operator can think of a further delay imho... why not replicate 2018 and delay until winter rains and spting rains pass and do it 2020..
- Forums
- ASX - By Stock
- XST
- Ann: ACQUISITION OF ADDITIONAL SACRAMENTO BASIN ASSETS
Ann: ACQUISITION OF ADDITIONAL SACRAMENTO BASIN ASSETS, page-4
-
- There are more pages in this discussion • 7 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add XST (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.9¢ |
Change
0.000(0.00%) |
Mkt cap ! $2.893M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
XST (ASX) Chart |
Day chart unavailable