Can anyone confirm if they know if the Low hanging fruit / Ore is not in the deeper flooded sections of this mine & more in the sections which contain the U/ Workings development systems over the 120kms
I heard that they will not be targeting the KORES resource of 2.34 M/t as this takes account the deeper sections that are currently flooded - so the 3D model evaluation is just on the higher section of the mine at 500m depth - so the resource figure target will be smaller.
Just hope the left over Ore will add a good bonus to their Target 3 d model plan resource figures
SAU Price at posting:
30.5¢ Sentiment: Hold Disclosure: Held