It is a real pain having the delay on assays, as so far the mineralization looks a bit rough and patchy, 50m widths holes 3 and 8, but they haven't been able to replicate or join those as yet.
The hole 8 intersection may end up being the more important strike if hole 10 (heading further west) reveals the continuation of the large vein hosted mineralization.
For the life of T3 it has gone from thrpughput of 2mtpa to 2.5mtpa and now at 3.5mtpa, we just need an economic orebody closeby to take that in to 4's.
I would like to see another announcement regarding further targets with T3 dome as T20 will be open shortly as well.
All drill rigs on A4 won't get SP moving with any strength.
Also assay delays were explained but a better solution will be needed other than just prioritizing the samples for the good hits. Especially if more rigs get going..
Perhaps A4 samples can continue to go through this lab but any new target drilling we could employee a second lab for those?
Not the avelanche of news that I thought may have been building up, but still a lot to come.