Thanks JS and John .
Hope they can find a structure in their permits where the NPF outcrops or is near surface .
Looks like it could support a big mine if it is as extensive as they think and the thickness and grades prove up .
The diagram of the A3 pit looks like it gets them not too far away from the NPF .
The higher grades in the NPF will be very enticing once they get to the bottom of the pit .
Are they going all out on A4 to include it in a FS they want to bring out asap ?
Maybe they will change the drilling priorities once that is done .
I am still nonplussed about the SP though .There are plenty out there that know more than us and atm they are not buying .
What are they waiting for ?
Maybe buyers in London will have less fear and better understanding of operating in Africa .
gltah
MOD Price at posting:
40.0¢ Sentiment: Buy Disclosure: Held