I don't believe the SP is being dropped for a lower vwap. lack of interest
If the scoping study returns numbers similar to the ones in this announcement we will be set.
Page 10
Mining cost of US$50/t ore
Processing costs of US$20/t ore milled
Processing recovery of 80% for a Zn and Pb concentrate.
CZL Price at posting:
1.6¢ Sentiment: Hold Disclosure: Held