The EPC contract was fixed price and construction was completed on schedule, so the financials in the various presentations prior to start of production should be pretty close.
With the increase in the amount of both rooftop and large-scale solar, daytime power prices are likely to reduce in coming years, however the QLD Govt PPA will always provide a floor, and of course the generation will be able to be used to pump water for sale at higher prices once Stage 2 is up and running.
GNX Price at posting:
31.5¢ Sentiment: Buy Disclosure: Held