I wonder if the 128 MW is DC or AC? The web site for the Numurkah solar farm simply states that it is a 100 MW solar farm.
GNX Stage 1 has always been described as 50MW by Genex - I assume this means 50 MW AC. At this late stage of commissioning peak output is 44MW, and will presumably increase to somewhere around 50 MW as the sun gets higher during summer months.
Beryl is described as 108.4MW DC/ 87.0MW AC.
GNX Price at posting:
30.0¢ Sentiment: Buy Disclosure: Held