We don't know where they are going to drill the holes 5,6,7...
They are currently drilling hole no. TD-004. The planned length of this hole is 140m. (see the drill plan below). It was said on the latest anns. on Monday that the TD-03 drill hole was completed on Thursday April 26, and the drilling for TD -004 was started. If they moved the rig to TD-004 location on Friday then the drilling should have started on Saturday. At most they should have finished the TD-004 in 5 or 6 days. That means it will be finished today or Friday.
After the drilling of TD-004, depends on what they have found and seen in the cores, the rig might stay there and drill another hole, or might be moved to TD-003 location for drilling other holes to define the geometry and geology of 26m pegmatite and find other pegmatites there.