Full steam ahead, the first drill rig starts turning next week.
Drill rigs 2 and 3 expected to arrive in April on a 24/7 basis for 6 months.
Drilling targeted using the seismic survey results which has been very effective in the past. Couple this with the improved Zambian Copperbelt style model and I'm expecting a good outcome that will finally make the market take notice.
- Forums
- ASX - By Stock
- Ann: 2018 Walford Creek Drilling Program
Full steam ahead, the first drill rig starts turning next week....
-
- There are more pages in this discussion • 2 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AML (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $5.482M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
AML (ASX) Chart |
Day chart unavailable