Unfortunately this ann is late as usual. McHale in his post on Wed, April 11th reports that he spoke to Hamish Collins on Monday, April 9th who told him then that drilling was already underway.
Another example for those SH keeping a continuous disclosure log.
Hopefully, the drilling will make up for the other shortfalls however.
Good luck to all!
- Forums
- ASX - By Stock
- Ann: 2018 Drilling Underway at Walford Creek
Unfortunately this ann is late as usual. McHale in his post on...
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AML (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $5.482M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
AML (ASX) Chart |
Day chart unavailable