-
Share
5,477 Posts.
1040
18/07/11
21:36
Share
re: Ann: 137 metre thick coal sequence inters...
Good call mate once again.
The coal is starting fairly shallow as per the log, hence the rationale behind shallow trenching & following the strike line.
Here's the aerial showing that open pit mine. they've mentioned in their 1st of July & this morning's updates.
The rail spur is 14kms due north.
Size of the tenement is 3451 ha. However, their initial estimates r based on a 8m thk seam with a fairly low SG of 1.3 over 7200000m2 area.
Need more drilling & coal quality (CV, moisture) testing results, given that this is just the first hole.
Aerial view
Railspur aerial view.
-