Depends on the jurisdiction - there's a new 270 MW solar power station combined with pumped hydro planned for QLD. The QLD govt has declared the entire project "Critical Infrastructure" and is committing $150 million towards construction of a new high-voltage transmission line to connect it to the grid. (This is a lot easier to do when the grid hasn't been privatised! )
http://www.genexpower.com.au/uploads/6/6/1/2/6612684/critical_infrastructure_-_28.06.17.pdf
- Forums
- ASX - By Stock
- Ann: 10MW Northam Solar farm Update
Depends on the jurisdiction - there's a new 270 MW solar power...
-
- There are more pages in this discussion • 9 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CCE (ASX) to my watchlist