Sorry Danube
I replied in the NXS thread when i should have replied here.
P10 is said to be 64mmbls, P90 is 23mmbls and 2P is 37mmbls.
2P @ 40% interest for AZA is 15mmbls.
It will take some time to re-evaluate the implications of the latest drilling results.
Analysts are suggesting a possible downgrade to 2P reserves but an increase in 1P.
Hope this helps.