This is an extract from a RUM presentation which I found interesting. Aragon to earn 40%. Drilling to commence mid-october!
Joint Venture between Rum Jungle Uranium Ltd and Aragon Resources Ltd over three granted ELs (25183, 25184, 25185). RUM has applied for two ELAs to the south of the project area. RUM to spend $3 million over 5 years to earn 60%. Rum to spend and extra $2 million over 2 years to earn a further 10%. Aragon have the right to contribute their 40% after stage 1 if they wish. Ammaroo Phosphate Project Joint Venture signed on July 1, 2010. 6000m Air Core drilling program to commence in mid October 2010. Exploration Agreement between Aragon and the Central Land Council already in place. Phosphate originally found by VAM drilling in 1968: 3m @ 22% P205 from 25m 10m @15% P205 from 37m No further drilling until Aragon in 2009: 19m @ 11% P2O5 from 35m 13m @ 14.2% P2O5 from 23m 20m @ 16.7% P2O5 from 34m 11m @ 12.2% P205 from 24m
AAG Price at posting:
30.0¢ Sentiment: LT Buy Disclosure: Held