Well everything passed today at the meeting, so expect a name change shortly to SIHAY GOLD LIMITED & new code SIH.
Take a good read of the presentation released today, very nice read imo:
Focus on development of Sihayo Gold Project
INTO VALUE
. . .
• Two fold strategy
1. Complete Definitive Feasibility Study by late 2010
• Positive Scoping Study completed at US$800 per oz
• Feasibility team has commenced work and resource drilling underway
• Approvals and construction 2011 to mid 2012
• Aim for production by mid 2012
2. Expand current resource base
• We believe there is potential for a multi million ounce resource
• 7km long mineralised structure – open to the north
• Limited historical drilling outside current resource
• Recent exploration drilling continues to discover broad regions of additional gold
• Low discovery cost to date – US$7.50 per ounce
• Exploration drilling to continue in parallel to DFS
**Greg Entwistle – DFS Project Coordinator (Perth) 20 years Indonesian experience, ex Matarbe
project director
Drilling focused on 4km zone between Sihayo 2 and Sambung
Initial success in identifying continuous mineralisation adjacent to the main Sihayo 1N
resource at Old Camp Prospect
Additional success at Sihayo 2 to the north and at Sihayo 1 between the two existing
resources
Development of a new geological model which opens up a large area under cover to the
North and West which has not previously been explored.
Adaption of new geochemical techniques to expand the search area to the north and
south.
Aim will be to increase the potentially economic resource base by 50 to 100%.
Exploration drilling will continue in parallel to the DFS
- Forums
- ASX - By Stock
- all resolutions passed & presentation
Well everything passed today at the meeting, so expect a name...
-
-
- There are more pages in this discussion • 2 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ORP (ASX) to my watchlist