Well, being up 22% should get us on some radars tonight so all good atm.
"Highlights: Phase 1 RAB drilling now complete at Targets 6-14 at the Zuleika JV Drilling at Zuleika comprised 209 RAB holes for 7,463 metres with results still awaited Results received from a 51 hole RC drilling program at Mt Stirling Well The Mt Stirling results confirmed high grade historic drill results and showed significant upside to the existing JORC Inferred resource The Company is now fast tracking a scoping study at Mt Stirling Well
TNR Price at posting:
19.5¢ Sentiment: Hold Disclosure: Held