KN1 flowed at 40mcf per day.
my point being.
TSV with joint venture partner Alcoa are drilling Warro 3 and today announced strong gas shows.
Waroo 1&2 hit a 200mt net of gas.
Schlumberger analysed the previous wells and expects between 5.8 to 6.4 Bcf daily flow rates from the first two wells. Assume the same from the third.
Combined 18bcf best case scenario.
We have 40mcf and have done absolutely nothing with it.
regards
- Forums
- ASX - By Stock
- all calm before the storm
KN1 flowed at 40mcf per day.my point being.TSV with joint...
-
-
- There are more pages in this discussion • 20 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add KEY (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.1¢ |
Change
0.000(0.00%) |
Mkt cap ! $2.262M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
KEY (ASX) Chart |
Day chart unavailable