So the nitrogen lift equipment was released and the well is now flowing back without assistance .
Am I understanding correctly that gas with associated liquids is having to contend with the pressure exerted by a vertical column of flowback fluid trying to kill the well because the production tubing is too wide for the gas to carry the flowback fluid with it so must bubble through it instead ?