Hey mate - They took the 2 rigs from T3 UG over to A4/A1 in May/June.. they mentioned this in the June quarterly. I’ve put a table below of where I have seen the rigs (diamond drill only, not RC) as per announcements.
They have mentioned a further DD rig (to 10) since early May but still nothing. They again mentioned more rigs are on the way in the half year rpt, I imagine there is some difficulties getting more DD rigs at this stage. The fact they are trying to add more indicates how promising the area is.
I think they have moved one from T1 having indicated they will do more AEM there in dec qtr to assist in drill hole targeting. I imagine there is still a rig operating at T3 to assist with the DFS - there are 22 holes from T3 awaiting assay according to latest announcements. Plenty to look forward to.
MOD Price at posting:
42.5¢ Sentiment: Buy Disclosure: Held