Thanks John, but just in case my question was not clear enough:
How much Capex in total would each Co need to/ has spent to have a plant that will/ is capable of a 300tph production??
From latest A40 ann:
Stage 2 Plant Upgrade
– Fines CircuitWork on the Front End Engineering Design (FEED) works for Stage 2 of the plant upgrade, which involves lowering theDense Media Separation (DMS) bottom size from 1mm to 0.5mm, is continuing to schedule.
The overall effect of this expansion phase will be an increase in plant processing capacity from the current 220tph to 300tph.