Thanks for the updated fun PDFs OGP.
NGP is OPEN! CTP is no longer capacity or customer constrained. Yippieia!
I surmise the pipe to the delightfully named Dead Bullock Soak Mine is open or about to be.
Better get drilling, lads! I look forward to hearing about the 2019 drilling program. Funded from cashflow, not holders.
Justin, fear not the Beetaloo Basin party-poopers.
Angela Macdonald-Smith in the AFR today, reporting NGP's opening:
(Jemina MD Frank Tudor) said if the production ambitions of Origin Energy and Santos were realised, Beetaloo gas could potentially be delivered into Queensland’s main gas hub at $6-$7 a gigajoule. The price of gas imported as LNG into the south-eastern states is expected to be over $10/GJ. However, the explorers are still working to prove up their gas resources in the NT, with drilling due to resume in 2019 following the wet season after the fracking moratorium was lifted this year.
Tonight, we can all dream of molecules flowing North, then East.
Ash