As at 31 Dec 2015
Sengkang LNG plant - $US467m
Pagbilao Power station - $US371m
Pagbilao LNG Hub - $US149m
Other projects - $US37m
Total - $US1,024 billion !!!!
Anyway, they are fixed assets, so they are not going to walk away.
Asset backing of $A41cents.
Just a matter of when they can get the Pagbilao power station up and running. Based on the spending for 6 months to 31st December of $US63, should be March 2017. However if they can draw-down DBP loan, then should be earlier than this. Seems ridiculous that it takes so long to draw down a loan. Maybe elections in the Phillipines doesn't help?
- Forums
- ASX - By Stock
- A most Frustating Stock
As at 31 Dec 2015 Sengkang LNG plant - $US467m Pagbilao Power...
-
- There are more pages in this discussion • 3 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add EWC (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.0¢ |
Change
-0.003(13.0%) |
Mkt cap ! $29.24M |
Open | High | Low | Value | Volume |
2.1¢ | 2.1¢ | 1.9¢ | $15.13K | 757.5K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 1258505 | 1.8¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
2.1¢ | 77196 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 97 | 0.095 |
3 | 311964 | 0.094 |
1 | 300000 | 0.093 |
1 | 25000 | 0.092 |
3 | 54000 | 0.090 |
Price($) | Vol. | No. |
---|---|---|
0.096 | 20355 | 1 |
0.097 | 3101 | 1 |
0.099 | 60000 | 1 |
0.100 | 71326 | 2 |
0.105 | 220678 | 4 |
Last trade - 15.59pm 29/11/2024 (20 minute delay) ? |
Featured News
EWC (ASX) Chart |
The Watchlist
NXD
NEXTED GROUP LIMITED
Nick Poll, Managing Director
Nick Poll
Managing Director
SPONSORED BY The Market Online